Twelve Trees
Construction progress film
About this architectural film
Twelve Trees was filmed in May 2025 while the buildings were still being finished. The film opens with the site team walking the job and talking through the work, then looks up at the two towers and the brick blocks around them.
Further on it covers the glazed canopy, the lower blocks with their pale stone frames, and the young trees planted along the site hoarding. The camera keeps moving slowly throughout, so the scale of the scheme comes across.
- Building
- Twelve Trees
- Client
- OCL
- Location
- London
- Type
- Construction progress film
- Length
- 1 min 30



Get in touch